Menu
Steel-Frame Clear Span Buildings in Wichita, Kansas - Grade 80 Steel Clear-Span Design
STEEL-FRAME CLEAR SPAN ยท WICHITA, KS

Steel-Frame & Clear Span Building Services in Wichita, KS | Pre-Engineered Metal Building Erection For South-Central Kansas

Wichita Pole Barn Builders erects steel-frame clear span buildings in Wichita and across the south-central Kansas area. We got our start more than 12 years ago putting up steel-frame buildings, and that is still the backbone of what this crew does. The crew itself brings more than 25 years in metal building construction. We handle all of it: standing the red-iron frames, setting purlins and girts, and installing every wall and roof panel. MABCD's plan guidelines require a Kansas-licensed engineer to seal the drawings and load certification for pre-engineered metal buildings, which makes sure each structure is designed for the site's wind and snow. We are also able to re-sheet and restore standing metal buildings.

Call 316-688-2046 Now โ†’

Get Your Pole Barn Quote

Tell us about your project. We'll call you back fast.

We'll respond same-week. Need to talk now? Call 316-688-2046.

25+ yrs
Erecting metal buildings
80,000
Sq ft, our largest projects
Sealed
Engineer's drawings required by MABCD
150 mi
Service radius from Wichita

We Build Steel-Frame Clear Span Buildings in Wichita & South-Central Kansas

Steel-frame buildings carry their loads on rigid red-iron frames. These are bolted to anchor bolts set in a concrete foundation. This is different from a post-frame building, which carries its loads on wood or concrete posts set in the ground.

Steel frames are the stronger choice for very wide spans, tall eaves and cranes. Post-frame is cheaper for farm and residential buildings.

  • Wind load basis: 115-120 MPH ultimate
  • Framing principle: Manufacturer-engineered rigid frames
  • Steel yield strength: Grade 80, 80,000 PSI
  • Paint finish: SMP or PVDF Kynar 500

How Rigid-Frame Engineering Achieves Clear Span

The building manufacturer engineers each rigid frame to carry roof and snow load across the full clear width, with purlins and girts spanning between the frames.

Roof and wall bracing carries lateral wind loads down through the endwalls to the foundation, and that frame engineering lets us push interior span further than a header-and-post system alone could support.

Technical Specs

  • Wind load basis115-120 MPH ultimate
  • Framing principleManufacturer-engineered rigid frames
  • Steel yield strengthGrade 80, 80,000 PSI
  • Paint finishSMP or PVDF Kynar 500
  • Panel gauge29-gauge standard, 26-gauge heavy-duty
  • FoundationAnchor-bolted concrete, per frame reactions

What Drives a Steel-Frame Price

Steel-frame clear span building projects around Wichita can only be priced as a range after we go through your final plans. We establish the structural materials your steel-frame building needs, since clear width and eave height set the red-iron frame, and then factor in sealed engineering, insulation, doors, office or mezzanine space, labor and concrete. Package prices you see online often quote just a bare metal shell dropped off in your driveway. Our turnkey estimates factor in the actual build: site prep, concrete footings, slab pouring, professional framing, trim, and permit coordination. We will source red iron and panel at fair market pricing throughout the Wichita metro. It could be a straightforward shell with proper framing, or a 100×200 clear span with an insulated envelope and an office build-out, and the insulation alone runs $7,300 to $40,000+. Call our local team today and we will start with the span and the use and give you an estimate range, with a firm number once we have seen the site.

Free
Written, itemized estimate
25+ yrs
Metal building experience
3โ€“4 ft
Post Depth (Past Frost Line)

Grade 80 Steel and Panel Specification

Grade 80 steel, 80,000 PSI minimum yield strength, is specified for clear-span buildings where panel performance under load matters most.

SMP and PVDF Kynar 500 are resin-based paint finishes. Whichever the panel supplier uses, we give you their published warranty in writing with your quote rather than quoting a term here.

Where Clear-Span Steel-Frame Construction Fits Best

Equipment storage, riding arenas, warehouse and light industrial space, and any use where interior support posts would interfere with function are the clearest fits.

Frame depth and purlin spacing get engineered specifically for the span in question rather than pulled from a standard building's specs.

Ribbed steel panel profile and red-iron frame connection on a clear-span build

What a PEMB Erection Includes

The building supplier engineers and fabricates the frames, and the erector puts them together on site. Erection quality decides whether the building performs as designed.

That means plumb frames, tight bolts and correct bracing before the sheeting goes on. Base details matter as well. The Metal Building Contractors and Erectors Association warns that wall panels normally sit about an inch and a half below the base elevation, and concrete poured against them at doors forms a pocket that rusts the panel.

Panels and finishes

Commercial wall panels are often Grade 50 or Grade 33 steel, while 29- and 26-gauge agricultural panels are typically Grade 80. PVDF finishes typically allow less fade than SMP. Coverage differs by supplier and by what is covered, film integrity against chalk and fade, so we hand you the actual warranty document.

Re-sheeting old buildings

Hail-dented or faded steel can be replaced without touching the frame. We remove the old panels, check the purlins and girts, and install new steel with fresh trim.

Meeting Commercial and Institutional Code Requirements

Wide clear-span steel buildings are frequently commercial or institutional, which brings this code vocabulary with them. Commercial, aviation, and assembly-occupancy buildings carry a different code burden than agricultural structures, and the engineering has to show it on paper.

  • Stamped engineered drawings. Required for essentially all commercial work, referencing the ASCE 7 Risk Category the design professional assigns for the proposed use.
  • ADA-compliant entry thresholds. Set by the accessibility requirements that apply to your occupancy, planned into the slab and door jamb detailing from the start rather than retrofitted.
  • Fire-rated wall assemblies. One-hour or two-hour drywall assemblies at demising walls where code requires separation between occupancies or tenant spaces.
  • Interior liner panel packages. 29-gauge white metal liner panels are a common commercial interior finish, paired with the continuous wall insulation the designer specifies for code compliance, and an easy surface to clean.
  • Thickened-edge slabs. Commercial slabs supporting forklift traffic are designed for the actual wheel and rack loads, which often calls for 8 to 12 inch thickened edge footings well beyond a standard residential slab perimeter, especially at dock and entry points.
  • MABCD plan review. Commercial occupancy in the Wichita metro core typically requires full plan review through the Metropolitan Area Building and Construction Department before a permit is issued.
  • Continuous wall insulation. Specified by the designer where the energy code compliance path for your occupancy calls for it, typically installed alongside the liner panel package rather than as a separate retrofit step.

Frequently Asked Questions

How wide a clear span can you build?
It depends on the frame engineering and roof pitch. Manufacturer-engineered rigid frames routinely reach wider clear spans than conventional framing at comparable cost, which is why we use them.
How is a steel-frame building different from a post-frame building?
Steel frames are red iron bolted to anchor bolts in a concrete foundation. Post-frame carries load on posts set in the ground. Steel wins on very wide spans, tall eaves and cranes.
Is a clear-span steel frame more expensive than conventional framing?
Not necessarily. At wide spans it is often less than the structural steel a conventional approach would need for the same open interior, though post-frame stays cheaper for farm and residential buildings.
Do the drawings have to be sealed by an engineer?
Yes. MABCD plan guidelines require a Kansas-licensed engineer to seal the drawings and load certification for pre-engineered metal buildings, referencing the applicable ASCE 7 Risk Category.
Which paint finish should I choose?
SMP and PVDF Kynar 500 are both resin-based finishes, with PVDF typically fading less. We hand you the panel supplier's published warranty document in writing with your quote.
Can you re-sheet an existing metal building?
Yes. Hail-dented or faded steel can be replaced without touching the frame. We pull the old panels, check the purlins and girts, then install new steel with fresh trim.
What do you need from me to quote the project?
Clear width, eave height and intended use first, since those set the red-iron frame. Add doors, insulation and any office or mezzanine space, and we give a range, then a firm number after a site visit.

Ready to Start Your Steel-Frame Clear Span Buildings Project?

Call now or request a free written quote. Most projects get a same-week site visit.

Call 316-688-2046 Now